  • Identify heat-exposed new square - assess UHI risk
    Evaluate options (white vs blue vs green)- select white measure
    Design layout, posts, anchoring; coordinate utilities
    Procure and install sun sails
    Operate seasonally; collect user feedback; plan basic monitoring

    Considering dense underground utilities, event needs, timelines, and budget, modular sun sails offered the best balance of speed, reversibility, and cost. The layout was co-designed with planning, public works, and events teams, utility clearances were checked, procurement was completed, and approximately 330 m² of shading was installed.

  • Site assessment and option screening
    Co-design with municipal teams and stakeholders
    Technical design and procurement
    Installation and seasonal operation plan
    Communication via municipal channels/events

  • Shading structures: HDPE sun sails (~180 g/m²), breathable/UV-resistant
    Reinforced hems, stainless corner hardware; adjustable tensioning
    Steel posts with stainless cladding; point foundations above dense utilities
    Seasonal install/remove; low-maintenance inspections
    Permits/clearances: standard public-space works approval, utility clearance, event-use coordination

  • Inputs from Climate Sandbox workshop, city planners, public works, tourism/events, local businesses
    On-site discussions during pilot and public events; informal citizen feedback gathered
    Ongoing communication via municipal website, social media, local media

  • Immediate thermal-comfort improvement in shaded zones
    Higher dwell times and better daytime event usability
    Maintains flexible use (markets/performances/pedestrian flow)

  • spring–summer period of 2025
  • Dense utilities and full paving constrained greening, white measure provided fastest impact with least disruption.
    No instrumented baseline in first season, plan monitoring in parallel with procurement (budget small sensors early).
    Keep desire lines clear: Early coordination with market/event layouts avoids later repositioning.

  • Start with a quick, reversible shading pilot in the highest-use paved areas
    Coordinate early with utilities and events; design for seasonal operation and easy maintenance
    Pair with basic monitoring (temp loggers + short surveys) and consider layering mobile green/blue elements